The finished roof, with gutters.
I still need to find another temporary downspout.
Next up: more dance floor sub-flooring and wall framing.
The finished roof.
All that's missing is the gutters.
Getting started after lunch.
About a third of the roof is on at this point.
We managed to finish 95 percent of the roof by nightfall.
Fascia and Rakes almost complete and roofing felt in place.
This photo taken after removing half a dozen tarps and about an eighth inch of frost.
The ends of the roof panels are in the foreground, and we have a ramp up which we'll carry the panels.
We now have two layers of one-by board diagonal sheathing on the roof.
As soon as we can get the gable rakes and the upper fascia varnished and nailed on, we'll be ready for the metal roof.
Apologies for the yellow ropes; we decided to put the tent back up to enlarge our dry working space a little bit.
We just keep adding boards.
All the blocking is in.
Three quarters of the roof over the entrance is in, and we're started on the second layer of the main roof.
A bit more blocking and almost half way through the first layer.
It's been a slow week.
We've been rained out more often than not.
Much isn't obvious,
but we've added furring strips to the trusses, the lower eaves, blocking along the lower eave,
some blocking along the upper eave, and the sheathing visible on the trusses.
Trusses spread out and secured.
Trusses delivered. We took photos and went to lunch.
During the afternoon, we got about half way through setting the trusses.
Installed: 26 Nov 2009; Last Modified: 12 Dec 2009