Tom Howell

Timber Frame Information. Dance Floor Information. Building Schedule.
 
 
The Current State of Affairs.
Barb Gardner Oct 2012: Main Entrance. Tom Howell
Barb The main entry.
Still need some battens over the door,
and two pieces of trim.
Tom

  Floor Sequence One       Frame Assembly and Raising       Roof Assembly     
  Floor Sequence Two Wall Framing Floor Sequence Three  
  More Wall Framing Wall Sheathing Floor Sequence Four  
  Some Windows Siding Doors  


In my spare time, I used to push things off-the-shelf.

Installed: 1 Feb 2001; Last Modified: 25 Oct 2012