| Timber Frame Information. | Dance Floor Information. | Building Schedule. | ||
| | ||||
|
The Current State of Affairs. |
||||
|
|
|
||
| Barb |
The main entry. Still need some battens over the door, and two pieces of trim. |
Tom | ||
| Floor Sequence One | Frame Assembly and Raising | Roof Assembly | ||
| Floor Sequence Two | Wall Framing | Floor Sequence Three | ||
| More Wall Framing | Wall Sheathing | Floor Sequence Four | ||
| Some Windows | Siding | Doors | ||