| Prior stage: Floor Sequence One | Next stage: Roof Assembly |
|
|
|
|
|
|
|
| Thu 18 October, B wall is together, but still needs to be pulled square and pegged. It was too dark to take pictures. My apologies. |
|
| Mon 12 October, we "dry fit" all the joints that will go together with the help of the crane. In the process, we also moved two of the south wall posts and the two parts of the south wall top plate down onto the dance floor joists. For Tuesday, we'll only have to move down two big, heavy posts. The remaining parts of the south wall are smaller and lighter. We should have the south wall assembled and pegged by Tuesday night - bar heavy rain. |