The second floor diaphragm/sub-floor is now done.
Eventually, it will only show as the ceiling for the lower floor.
A sunny day: who would have expected it?
Took this mid-morning.
By the end of the day, we'd done about a third of the remaining distance to the last post.
View from the west: ready to start bay window sub-flooring.
Nearly to the NE corner of the floor, and ready to start bay window sub-flooring.
Ceiling/floor/diaphragm installed to the SW corner of the floor.
Ceiling/floor/diaphragm installed to the chimney opening.
This layer comprises the "shelf" in the storage room.
Ceiling/floor/diaphragm installed to north-west corner of upper room..
Note how flooring extends over the space where the masonry heater will be built.
First few boards down and secured.
Ed's radial arm saw, ready to put 45 degree cuts on the ends of the boards.
Planed and edged boards for the upper floor diaphragm stacked in the bathroom and landing.
Installed: 17 Apr 2010; Last Modified: 10 May 2010